Scope of work includes reconstruction of the existing 30,851 sq.m. reinforced concrete roads surface and disposal, construction of a 11-to-15.6-meter-wide asphaltic concrete road with a total length of 2,777 meters (a total area of approximately 35,850 sq.m.), a 3-to-12-meter-wide crushed stone road and reinforced concrete roads with a total length of 2,162 meters (a total area of approximately 15,842 sq.m.), pavements and curbstones with a total area of approximately 5,446 sq.m., water and sewage drainage system and sewage manhole using reinforced concrete and PROPIPE dia. 800 mm., and installation of lighting systems.